McDATA 1U Server Manual de servicio Pagina 131

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 316
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 130
3
MAP 0000: Start MAP
3-7
Maintenence Analysis Procedures
A FRU failure, power-on self-test (POST) failure, link incident,
interswitch link (ISL) problem, fenced E_Port, or segmented
E_Port is indicated. To obtain event codes that identify the
failure, go to step 10.
4
Is the product management interface (browser PC, management
server, or OSI host console) powered on and operational?
NO YES
Go to step 7.
5
Power on the management interface platform and launch the
associated management application:
EFCM Basic Edition - Refer to Task 4: Configure Product at the
EFCM Basic Edition Interface (Optional) for instructions.
SAN management application - Refer to Task 6: Unpack,
Inspect, and Install the Management Server and Access the
Management Server Desktop for instructions.
OSI host console - Refer to documentation supplied with the
host system for instructions.
Was the maintenance action successful?
NO YES
Go to step 7.
6
Inspect the management interface for communication link failure.
Observe one of the following:
•A Page cannot be found, Unable to locate the server, HTTP
404 - file not found, or similar message (browser PC).
The icon representing the product displays a grey square with an
exclamation mark (SAN management application).
A grey square at the alert panel, a No Link status and reason,
and no visible product FRUs (Element Manager Hardware View).
Was a failure indication observed?
NO YES
Vista de pagina 130
1 2 ... 126 127 128 129 130 131 132 133 134 135 136 ... 315 316

Comentarios a estos manuales

Sin comentarios